Would you like to solve the waste and inefficiencies in the development and design department? *Problem-solving materials are currently being offered.
"Constant delays in design," "frequent rework in later processes," "aging of engineers," etc., we will introduce numerous case studies for solving issues in the design and development phase. *Video now available.*
In the manufacturing field, various troubles such as quality complaints and manufacturing defects stemming from the development and design department, as well as productivity declines due to rework, occur on a daily basis. Since the overall product cost and quality level are determined in the upstream processes, the responsibility of the development and design department is significant. However, due to personnel shortages and excessive workload, the shortening of design lead times has rendered design reviews insufficiently functional, leading to a "negative spiral" where there is no room to address fundamental trouble countermeasures. To eliminate this "negative chain" at the design stage, we are presenting case studies of problem-solving through design and development consulting. Please feel free to view them via "PDF Download." We are also releasing seminar videos that clearly illustrate the structure of challenges in design and development! 【Problem-Solving Case Studies (Partial)】 ■ Activation of Design Reviews ■ Realization of productivity and quality improvements through the use of IoT and AI ■ Standardization of design for custom orders, etc. *For more details, please contact us or download the PDF.
- Company:テクノ経営ウェブソリューションズ
- Price:Other